The renewal and the enhancement of the historic carriage road within ParcoGiardino Miramare, along with the botanical regeneration of the area.
Scroll through the interactive map to get a comprehensive overview of the project's planned interventions, focused on an area of approximately 3 hectares within the total 22 hectares of the ParcoGiardino
00.
Works DiaryParcoGiardino
Miramare
1. The Castle
2. The Formal Gardens
3. The Stable Pavillon
01.
Works DiaryIntervention
Area
00.1
Borders of the intervention area under the National Recovery and Resilience Plan (PNRR).
Detail of the
intervention area
00.1
Borders of the intervention area under the National Recovery and Resilience Plan (PNRR).
02.
Works DiaryRenewal
of paths
02.1
Realignment and restoration of retaining walls along the existing slopes bordering the main pathway
02.2
Arrangement of permeable pavements and curbs
02.3
Securing the panoramic viewpoint
03.
Works DiaryArchitectural
redevelopment
03.1
Recovery and repurposing of adjacent areas to enhance visitor reception – creation of a new rest area with seating and fountain
03.2
Restoration and consolidation of rustic stone-block galleries and portals
04.
Works DiaryResource
sustainability
04.1
Sustainable rainwater management (containment of excess water, creation or reactivation of collection tanks, and drainage systems)
04.2
Installation of energy-efficient lighting systems
05.
Works DiaryBotanical
enhancement
05.1
Control and eradication of invasive alien plants for the preservation of biodiversity
Intervention area
05.2
Planting of new vegetation in continuity with the species already present in the park, including Black Pine, Scots Pine, and Aleppo Pine
Pinus Halapensis subsp. Brutia
Pinus Halapensis
Pinus Nigra
Pinus Pinaster
Pinus Sylvestris